Every asset, with its whole history behind it.
Keep each customer's equipment on one register. On site, an engineer scans the QR label and sees what the asset is, when it was last tested and what the readings were.
What assets gives you
One register
Every piece of equipment is listed under its customer and site with its own number, so anyone in the office or on site can find it.
Scan the QR label
Scanning the label on the equipment opens its record: details, test history and last readings, there on the engineer's phone.
The details that suit the equipment
A transformer holds its serial number, rating, oil volume and vector group. Each kind of asset keeps the attributes that matter for it.
Know what is due
Each asset shows when it was last seen, when it is next due, any open findings and the contract that covers it.
What it looks like.

- Last seen
- 14 May 2026
- Next due
- 19 Nov 2026 Planned visit, twice a year
- Findings
- 1 open
- Cover
- CON-0012 HV substation and transformer PPM
| Date | Test | Reading | Result | By |
|---|---|---|---|---|
| 14 May 2026 | Oil sample, breakdown voltage | 58 kV | Pass | Callum Fraser |
| 14 May 2026 | Insulation resistance, HV to earth | 5,200 MΩ | Pass | Callum Fraser |
| 12 Nov 2025 | Thermographic survey, LV bushings | 41 °C max | Monitor | Ben Carver |
| 12 Nov 2025 | Oil sample, breakdown voltage | 61 kV | Pass | Marcus Bell |
Included
What is in assets.
- Assets grouped by customer and site
- QR labels
- Test history per asset
- Last readings on record
- Next visit due
- The contract covering each asset
Keep going
It all works from the same records.
See it run one of your own jobs.
Bring a job you quoted last month. We will take it from quote to certificate in Scedual while you watch, and you can ask anything along the way.
Callum Fraser
Ben Carver
Marcus Bell